Modern-ag Tilting Grader Blade Manuel d'utilisateur Page 2

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 8
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 1
2 - C2 Tilting Grader Blade
PRE-DELIVERY CHECKLIST
Inspect the blade thoroughly after assembly to be
certain it is set up properly before delivering it to
the customer. The following checklist is a reminder
of points to inspect. Check off each item as it is
found satisfactory or after proper adjustment is
made.
DELIVERY CHECKLIST
     
that is bolted in an upside down shipping
position.
___Show customer how to make adjustments.
___Point out safety features.
___ Give Operators Manual to the customer and ask
him to familiarize himself with all sections of it.
DAILY CHECKLIST
___ Check that unit is properly and securely
attached to tractor.
      
secure and cotter pins are in place.
___ Check that cutting edge of blade is in good
condition.


Date Dealers Rep Signature
The above equipment and Operators Manual have been received by me and I have been thoroughly

Date Owners Signature
CHECK LIST
Vue de la page 1
1 2 3 4 5 6 7 8

Commentaires sur ces manuels

Pas de commentaire